Jal Shakti | Status on National River Linking Project

ad
Over 3.5 lakh Water Conservation Measures taken up in a single month as nationwide Jal Shakti Abhiyan
Over 3.5 lakh Water Conservation Measures taken up in a single month as nationwide Jal Shakti Abhiyan

The National Perspective Plan (NPP) was prepared by the then Ministry of Irrigation (now Ministry of Jal Shakti) in August 1980 for water resources development through inter basin transfer of water, for transferring water from water surplus basins to water-deficit basins. Under the NPP, the National Water Development Agency (NWDA) has identified 30 links (16 under Peninsular Component & 14 under Himalayan Component) for preparation of Feasibility Reports. Details and status of the proposals for inter-state linking of rivers under the Inter Linking of Rivers Programme is furnished at Annexure.

The implementation of the ILR projects depend on the consensus of the concerned States. Thus the interlinking of rivers programme is being pursued based on the principle of consensus and agreement among the concerned States. An interlinking project would reach the implementation stage once agreement amongst party states is reached on water sharing. Thereafter for implementation all requisite statutory clearances need to be obtained.

Government of Uttar Pradesh has requested NWDA to take up the study of linking Sharda River to Gomtiriver. Draft Pre-Feasibility Report of the Intra State link viz; Sharda-Gomti link has been completed by NWDA  and submitted to the State Government in October, 2021.

This Information was given by the Minister of State for Jal Shakti, Shri Bishweswar Tudu in a written  reply in Lok Sabha today.

 

AnnexurE

 

 

 

 

S.

No

Name Rivers States concerned Status
Peninsular Component
1(a) Mahanadi (Manibhadra)–

Godavari (Dowlaiswaram) link

Mahanadiand Godavari Jharkhand, Madhya Pradesh, Chhattisgarh, Telangana,

Andhra Pradesh, Odisha, Karnataka and Maharashtra

FR Completed.
1(b) Mahanadi (Bermul)–

Godavari (Dowlaiswaram) link

Mahanadi and Godavari do FR Completed.*

Preparation of DPR under progress.

2 Godavari(Inchampall)-Krishna(Pulichintala)

link

Godavariand Krishna Odisha, Madhya Pradesh, Chhattisgarh, Telangana, Andhra Pradesh, Maharashtra

and Karnataka

FR Completed.
3 Godavari(Inchampalli)-Krishna (Nagarjunasagar) link Godavariand Krishna –do– FR Completed.
DPR

Completed.

4 Godavari(Polavaram)

– Krishna(Vijayawada) link

Godavari and Krishna –do– FR Completed.
5 Krishna(Almatti)

–Pennar link

Krishna and Pennar Telangana, Andhra Pradesh,Maharashtra and Karnataka FR Completed.
6 Krishna (Srisailam)–Pennar link Krishna and Pennar –do– FR Completed.
7 Krishna(Nagarjunasagar)-Pennar (Somasila) link Krishna and Pennar –do– FR Completed.
DPR Completed.
8 Pennar (Somasila)–Cauvery(Grand Anicut) link Pennar and Cauvery Andhra Pradesh, Karnataka, Tamil Nadu, Kerala and Puducherry FR Completed.
DPR Completed.
9 Cauvery (Kattalai)–Vaigai–Gundar link Cauvery, Vaigai and

Gundar

Karnataka, Tamil Nadu, Kerala and Puducherry DPR Completed.
10 Ken–Betwa link Ken and Betwa Uttar Pradesh and Madhya Pradesh DPR (Phase – I, II & Comprehensive report) Completed.
Contd…
11

(i)

Parbati – Kalisindh –Chambal link Parbati, Kalisindhand Chambal Madhya Pradesh,Uttar Pradesh and Rajasthan requested to be Consulted during consensus building) FR Completed.
(ii) Parbati-Kuno-Sindh link Parbati, Kuno and Sindh Madhya Pradesh and Rajasthan PFR completed.$
12 Par-Tapi-Narmada link Par, Tapi and Narmada Maharashtra and Gujarat DPR Completed.
13 Damanganga – Pinjal link Damanganga and Pinjal –do– DPR Completed.
14 Bedti-Varada link Bedti and Varada Maharashtra, Andhra Pradesh and Karnataka PFR Completed.

Draft DPR completed

15 Netravati – Hemavati link Netravati

and Hemavati

Karnataka, Tamil Nadu and Kerala PFR Completed.
16 Pamba – Achankovil –Vaippar link Pamba,Achankovil and Vaippar Kerala and Tamil Nadu FR Completed.
 

Integration of Eastern Rajasthan Canal Project of Rajasthan and Parbati – Kalisindh – Chambal link.

 

 

Himalayan Component
1. Manas-Sankosh-Tista-Ganga(M-S-T-G)link Manas,Sankosh,

Tista and Ganga

BHUTAN&INDIA

(Assam,West Bengal and Bihar)

FR completed.

DPR in progress.

2. Kosi-Ghaghra link Kosi and Ghaghra NEPAL&INDIA

(Bihar and Uttar Pradesh)

PFR completed
3. Gandak-Ganga link Gandak and Ganga –do– FR completed (Indian portion)
4. Ghaghra-Yamuna link Ghaghra and Yamuna –do– FR completed (Indian portion)
5. Sarda-Yamuna link Sarda and Yamuna NEPAL&INDIA

(Bihar, Uttar Pradesh, Uttarakhand, Haryana

And Rajasthan)

FR completed (Indian portion)
6. Yamuna-Rajasthan link Yamuna and Sukri Gujarat, Rajasthan, Haryana and UttarPradesh FR completed
7. Rajasthan-Sabarmati link Sabarmati –do– FR completed
8. Chunar-Sone Barrage link Ganga and Sone Bihar and Uttar Pradesh Draft FR completed
9. Sone Dam – Southern Tributaries of Ganga link Sone and Badua Bihar and Jharkhand PFR completed
 

Contd…

10. Ganga (Farakka)-Damodar-

Subernarekha link

Ganga, Damodar and Subernarekha West Bengal,Odisha and Jharkhand FR completed

DPR in progress

11. Subernarekha-Mahanadi link Subernarekha and Mahanadi West Bengal and Odisha FR completed
12. Kosi-Mechi Link Kosi and Mechi NEPAL & INDIA

(Bihar and West Bengal)

PFR completed
13. Ganga (Farakka)-Sunderbans link Ganga and Ichhamati West Bengal FR completed
14. Jogighopa-Tista-Farakkalink(Alternative to M-S-T-G) Manas,Tista and Ganga Assam, Bihar andWest Bengal Dropped

 

 

  • PFR- Pre Feasibility Report
  • FR- Feasibility Report
  • DPR- Detailed Project Report