maglev-bullet-trains-indian-bureaucracy
Central

MAGLEV Bullet Trains

December 6, 2016

Indian Railways have floated an Expression of Interest (EOI) for designing, building, commissioning, operation, running and maintenance of levitation based train system on Public

joint-venture-projects-indian-bureaucracy
Central

Joint Venture projects of Indian Railways

December 5, 2016

So far, 5 State Governments namely Chattisgarh, Gujarat, Haryana, Kerala and Odisha have signed the Joint Venture agreement to create State specific joint ventures

bio-toilets
Central

Status on fitting of Bio-Toilets in Trains

November 29, 2016

The project of installation of bio-toilets in passenger coaches has not yet been completed. The project is still in progress. More than 49,000 bio-toilets

adarsh-scheme-indian-railways-indian-bureaucracy
Central

Adarsh Station scheme of Indian Railways

November 28, 2016

Development/modernization of stations is presently taken up under ‘Adarsh Station Scheme’. The expenditure on development of stations under ‘Adarsh’ Station Scheme is generally funded

Stainless Steel Coaches – 2016 function-Indian Bureaucracy
Central

Stainless Steel Coaches

November 27, 2016

The Indian Railways is already manufacturing certain types of Passenger coaches and Wagons with Stainless steel material. The details are as follows: MAINLINE COACHING

Railway Board
Central

Rail Display Network at Railway Stations

November 19, 2016

As announced by Minister of Railways, a high-tech centralized network of screens across major stations, known as Rail Display Network is proposed, which will

rail-vikas-shivir-indian-bureaucracy
Central

PM Commences 3 Day Rail Vikas Shivir

November 19, 2016

At the initiative of the Prime Minister Shri Narendra Modi, as an unprecedented milestone mega exercise, involving the entire organization at all levels, Indian

bio-toilets
Central

Bio Toilets in Trains

November 18, 2016

The project of installation of bio-toilets in passenger coaches has not yet been completed. The project is still in progress. More than 49,000 bio-toilets