- Production of Crude Oil
Crude oil production[1] during November,2020 was2486.01 TMT which is7.25% lower than target and4.91% lower when compared with November, 2019.Cumulative crude oil production during April-November, 2020 was 20426.50 TMT which is 5.28% and 5.98% lower than target for the period and production during corresponding period of last yearrespectively. Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of November, 2020 and cumulatively for the period April-November, 2020 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company | Target | November (Month) | April-November (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
ONGC | 20931.54 | 1739.06 | 1647.62 | 1673.23 | 98.47 | 14022.87 | 13508.55 | 13638.31 | 99.05 |
OIL | 3268.00 | 273.97 | 243.20 | 260.17 | 93.47 | 2115.91 | 1985.34 | 2147.01 | 92.47 |
PSC Fields | 8265.00 | 667.41 | 595.19 | 680.91 | 87.41 | 5426.93 | 4932.62 | 5939.42 | 83.05 |
Total | 32464.53 | 2680.44 | 2486.01 | 2614.31 | 95.09 | 21565.71 | 20426.50 | 21724.74 | 94.02 |
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
-
- Crude oil production by ONGC in nomination block during November, 2020 was 1647.62 TMT which is 5.26%lower than target and1.53%lower when compared with November 2019. Cumulative crude oil production by ONGC during April-November, 2020 was 13508.55 TMT which is 3.67%and 0.95% lower than target for the period andproduction during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Production planned from WO-16 cluster could not be realized due to delay in MOPU (Sagar Samrat) as activities at GPC yard Abu Dhabi got affected due to COVID restrictions/lockdown
- Production planned from new wells in Ratna field affected due to non- availability of ESPs (electrical submersible pumps) for well completion due to implications of COVID-19
- New wells planned under Cluster-8 development project delayed due to toppling of D-30-2 platform jacket during installation and further delay in installation of new platforms due to COVID implications
-
- Crude oil production by OIL in the nominationblock during November, 2020 was243.20 TMT which is 11.23% lower than the monthly target and 6.53% lower than the November, 2019. Cumulative crude oil production by OIL during April-November, 2020 was 1985.34 TMT which is 6.17% and 7.53% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than planned contribution from workover wells, drilling wells and old wells.
- Bandhs /blockade by local people and associations etc. after the Baghjan Blowout, protests/agitation etc.
-
- Crude oil production by Pvt/JVscompanies in the PSC (production sharing contract) regime during November, 2020 was 595.19 TMT which islower by 10.82% than the monthly target and 12.59%lowerthanNovember, 2019.Cumulative crude oil production by Pvt/JVs companies during April-November, 2020 was 4932.62 TMT which is 9.11% and 16.95% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- RJ-ON-90/1 (CEIL): (1) Mangla–Shortfall in production due to reasons inter-alia failure of hydraulic submersible pump, delay in hook up of new injectors (Mangala), delayed start-up of polymer injection (Aishwarya), high water cut (Saraswati), ceasing of flow (Guda).
- CB-ONN-2003/1 (ONGC): Production is less due to COVID-19 situation, rig mobilization got delayed resulting in Drilling of new wells and less crude offtake.
- CB-ONN-2004/2 (ONGC): Development wells could not be drilled as planned in Q1 & Q2 FY2020-21 respectively.
- CB-ONN-2000/1 (GSPC):Lower production due to reservoir issues and shut in of wells.
- Production of Natural Gas
Natural gas production during November,2020 was 2331.25MMSCM which is 20.56% lower than the monthly target and 9.06% lower when compared with November, 2019. Cumulative natural gas production during April-November, 2020 was 18704.02MMSCM which is 14.79% and 11.81% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of November, 2020 and cumulatively for the period April-November, 2020 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (inMMSCM)
Oil Company | Target | November (Month) | April-November (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
ONGC | 24437.08 | 2005.53 | 1823.53 | 1893.85 | 96.29 | 16299.03 | 14686.59 | 15919.91 | 92.25 |
OIL | 3181.54 | 276.29 | 203.91 | 228.20 | 89.36 | 2126.41 | 1668.20 | 1851.81 | 90.08 |
PSC Fields | 6826.82 | 652.73 | 303.81 | 441.36 | 68.84 | 3524.72 | 2349.23 | 3437.85 | 68.33 |
Total | 34445.44 | 2934.54 | 2331.25 | 2563.40 | 90.94 | 21950.17 | 18704.02 | 21209.56 | 88.19 |
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure-2: Monthly Natural Gas Production
-
- Natural gas production by ONGC in the nominationblocks during November, 2020 was 1823.53MMSCM which is 9.07% lower than target and 3.71% lower when compared with November 2019. Cumulative natural gas production by ONGC duringApril-November, 2020 was 14686.59 MMSCM which is 9.89% and 7.75% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- Closure of Gas wells in western offshore due to Hazira Plant shutdown on 24.09.20 and subsequent normalization.
- Less Gas production from WO16 cluster due to delay in Mobile Offshore Production Unit (MOPU) and non-realization of gain planned from new subsea wells in Bassein field due to delay in subsea umbilical connections/hook up jobs in view of Covid-19 implications.
- Less than planned production from Vasistha/S1 wells in EOA (Eastern Offshore Assets) due certain reservoir related issues.
-
- Natural gas production by OILin the nomination block during November, 2020 was 203.91 MMSCM which is 26.20% lower than monthly target and 10.64% lower than November, 2019. Cumulative natural gas production by OIL during April-November, 2020 was 1668.20 MMSCM which is 21.55% and 9.92% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Low upliftment/demand of gas by the major customers.
- Bandhs /blockade by local people and associations etc. after the Baghjan Blowout, protests/agitation etc.
-
- Natural gas production by Pvt/JVs companiesin the PSC (production sharing contracts) regime during November,2020 was 303.81MMSCM which is 53.46% lowerthan monthly target and31.16% lower than November, 2019. Cumulative natural gas production by Pvt/JVs during April-November, 2020 was 2349.23MMSCM which is 33.35% and 31.67% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- KG-DWN-98/3 (RIL): Impact of COVID on project progress of R-Series D-34 field of KG-DWN-98/3 and efforts are being made for its start-up.
- RJ-ON/6 (FEL): Reduced gas offtake by Power Plant customer with Gas turbine in shut down.
- RJ-ON-90/1 (CEIL): RDG – Delay in new RDG plant start up due to Covid-19.
- KG-DWN-98/2 (ONGC): Well U3-B is producing less than the estimated profile and well is flowing with lower choke due to increase in water cut.
- Raniganj East (ESSAR): Production curtailed due delay in GAIL Pipeline & limited sales off-take and to avoid flaring.
- Crude Oil Processed (Crude Throughput)
Crude Oil Processed during November, 2020 was 20781.77TMT which is 1.57% higher than the target for the month but5.11% lower when compared with November, 2019. Cumulative crude throughput during April-November, 2020 was139337.10 TMT which is 15.94% and 17.82% lower than target for the period and crude throughput during corresponding period of last year respectively. Refinery-wise details of the crude throughput and capacity utilization during the month of November, 2020 vis-à-vis November, 2019 are given at Annexure-III and Annexure-IV. Company-wise crude throughput for the month of November, 2020 and cumulatively for the period April-November, 2020vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Table 3: Crude Oil Processed (Crude Throughput) (in TMT)
Oil Company | Target | November (Month) | April-November (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
CPSE | 148031.12 | 12223.69 | 12191.32 | 12572.54 | 96.97 | 96410.26 | 77587.58 | 96230.25 | 80.63 |
IOCL | 72499.86 | 6049.23 | 6209.68 | 6090.08 | 101.96 | 47700.91 | 38771.00 | 46952.98 | 82.57 |
BPCL | 30499.95 | 2629.42 | 2584.71 | 2700.98 | 95.70 | 20518.21 | 15365.83 | 20585.96 | 74.64 |
HPCL | 17867.47 | 1067.63 | 1419.24 | 1520.37 | 93.35 | 11175.45 | 10741.22 | 11393.18 | 94.28 |
CPCL | 9000.00 | 900.00 | 729.45 | 788.63 | 92.50 | 5370.00 | 4838.02 | 6688.48 | 72.33 |
NRL | 2700.00 | 222.00 | 230.12 | 118.71 | 193.85 | 1804.00 | 1730.72 | 1759.48 | 98.37 |
MRPL | 15400.00 | 1350.00 | 1011.44 | 1346.26 | 75.13 | 9800.00 | 6089.40 | 8791.63 | 69.26 |
ONGC | 63.83 | 5.42 | 6.69 | 7.53 | 88.82 | 41.69 | 51.39 | 58.55 | 87.78 |
JVs | 14772.00 | 640.00 | 1631.92 | 1730.29 | 94.31 | 9175.00 | 10871.81 | 13141.41 | 82.73 |
BORL | 7800.00 | 640.00 | 593.93 | 657.83 | 90.29 | 5200.00 | 3666.24 | 5103.57 | 71.84 |
HMEL | 6972.00 | 0.00 | 1038.00 | 1072.46 | 96.79 | 3975.00 | 7205.57 | 8037.85 | 89.65 |
Private | 89515.16 | 7597.78 | 6958.53 | 7597.78 | 91.59 | 60183.37 | 50877.70 | 60183.37 | 84.54 |
RIL | 68894.99 | 5939.81 | 5482.03 | 5939.81 | 92.29 | 46340.49 | 39922.60 | 46340.49 | 86.15 |
NEL | 20620.18 | 1657.97 | 1476.50 | 1657.97 | 89.05 | 13842.89 | 10955.10 | 13842.89 | 79.14 |
TOTAL | 252318.28 | 20461.47 | 20781.77 | 21900.62 | 94.89 | 165768.63 | 139337.10 | 169555.04 | 82.18 |
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure 3: Crude Oil Processed (Crude Throughput)
3.1 CPSE Refineries’ crude oil processed during November, 2020 was 12191.32TMT which is marginally lower by 0.26% than the target for the month and3.03%lowerwhen compared with November, 2019.Cumulative crude throughputby CPSE refineries during April-November, 2020 was 77587.58TMT which is 19.52% and 19.37% lower than target for the period and crude throughputduring corresponding period of last year respectively.Reasons for shortfall in production are as under:
- IOCL-Koyali& Mathura: Crude processed regulated for low product demand due to COVID impact.
- IOCLK-Digboi: Crude processed lower due to planned shutdown deferred.
- BPCL-Kochi: Crude processed lower due to emergency shutdown of VGO Hydro-treater Unit.
- HPCL-Mumbai: Crude processed lower due to unplanned shutdown of secondary units.
- CPCL-Manali & MRPL-Mangalore: Crude processed lower due to Lower demand due to impact of COVID-19 lockdown.
- NRL-Numaligarh: Crude processed lower due to in line with domestic allocation.
3.2 JV refineries’ crude oil processed during November, 2020 was 1631.92TMT which is 154.99% higher than the target for the month but 5.69% lower when compared with November, 2019. Cumulative crude throughput during April-November, 2020 was10871.81 TMT which is 18.49% higher than target for the period but17.27% lower when compare with the corresponding period of last year respectively.
3.3 Private refineries’ crude oil processed during November, 2020 was 6958.53TMT which is 8.41% lower than the corresponding month of last year. Cumulative crude throughputduring April-November, 2020 was 50877.70 TMT which is 15.46% lower than thecorresponding period of last year.
- Production of Petroleum Products
Production of Petroleum Products during November, 2020 was 21425.49 TMT which is 1.79% higher than the target for the month but 4.83% lower when compared with November, 2019. Cumulative production during April-November, 2020 was 147590.55 TMT which is 12.89% and 14.87% lower than target for the period and production during corresponding period of last year respectively. Unit-wise production of petroleum products is given at Annexure-V. Company-wise production for the month of November, 2020 and cumulatively for the period April-November, 2020 vis-à-Vis same period of last year has been shown in Table-4 and month-wise in Figure-4.
-
- Production of petroleum Products by Oil’s Refineries during November, 2020 was 21047.82 TMT which is 1.93% higher than the target for the month but 4.82% lower when compared with November, 2019. Cumulative production of petroleum products by refineries during April-November, 2020 was 144762.79 TMT which is 12.96% and 14.94% lower than target for the period and production during corresponding period of last year respectively.
-
- Production of petroleum Products by Fractionators during November, 2020 was 377.68 TMT which is 5.67% lower than the target for the month and 5.73% lower when compared with November, 2019. Cumulative production by Fractionators during April-November, 2020 was 2827.76 TMT which is 9.13% and 11.12% lower than target for the period and production during corresponding period of last year respectively.
Table 4: Production of Petroleum Products (TMT)
Oil Company | Target | November (Month) | April-November (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
CPSE | 139203.86 | 11496.63 | 11512.94 | 11860.20 | 97.07 | 90701.66 | 73499.48 | 90669.39 | 81.06 |
IOCL | 68912.87 | 5747.30 | 5899.48 | 5810.17 | 101.54 | 45335.10 | 37164.70 | 44640.70 | 83.25 |
BPCL | 28965.13 | 2501.41 | 2474.28 | 2603.91 | 95.02 | 19501.93 | 14752.21 | 19517.69 | 75.58 |
HPCL | 16438.97 | 976.36 | 1336.30 | 1369.33 | 97.59 | 10278.97 | 10003.08 | 10556.45 | 94.76 |
CPCL | 8278.87 | 835.00 | 690.61 | 705.09 | 97.95 | 4910.99 | 4447.30 | 6128.25 | 72.57 |
NRL | 2660.91 | 218.71 | 239.74 | 111.13 | 215.74 | 1778.80 | 1758.40 | 1698.07 | 103.55 |
MRPL | 13887.11 | 1212.76 | 866.12 | 1253.50 | 69.10 | 8856.69 | 5324.51 | 8073.61 | 65.95 |
ONGC | 60.00 | 5.10 | 6.42 | 7.08 | 90.65 | 39.19 | 49.28 | 54.63 | 90.21 |
JVs | 13590.40 | 570.92 | 1495.05 | 1670.89 | 89.48 | 8421.60 | 10107.24 | 12333.57 | 81.95 |
BORL | 6958.40 | 570.92 | 531.43 | 608.03 | 87.40 | 4639.60 | 3191.20 | 4671.42 | 68.31 |
HMEL | 6632.00 | 0.00 | 963.62 | 1062.86 | 90.66 | 3782.00 | 6916.05 | 7662.15 | 90.26 |
Private | 102154.50 | 8581.66 | 8039.83 | 8581.66 | 93.69 | 67185.50 | 61156.07 | 67185.50 | 91.03 |
RIL | 82374.12 | 7042.15 | 6536.54 | 7042.15 | 92.82 | 53958.26 | 50562.50 | 53958.26 | 93.71 |
NEL | 19780.38 | 1539.50 | 1503.28 | 1539.50 | 97.65 | 13227.24 | 10593.57 | 13227.24 | 80.09 |
Total Refinery | 254948.76 | 20649.21 | 21047.82 | 22112.74 | 95.18 | 166308.77 | 144762.79 | 170188.47 | 85.06 |
Fractionators | 4572.73 | 400.36 | 377.68 | 400.62 | 94.27 | 3111.84 | 2827.76 | 3181.64 | 88.88 |
TOTAL | 259521.49 | 21049.57 | 21425.49 | 22513.36 | 95.17 | 169420.61 | 147590.55 | 173370.11 | 85.13 |
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure 4: Monthly Refinery Production of Petroleum Products
[1]Including condensate
Click here to see Annexure-III