In an Indian government news update, several measures have been taken by Indian Railways to modernize / upgrade rail coaches of Mainline trains in the recent past. These include provision of improved interiors with upgraded fire retardant properties, Bio Toilets, Balanced Draft Gear for reducing the jerks in Centre Buffer Couplers (CBC) fitted coaches, Light Emitting Diode (LED) lighting, Screw less Fibre-Reinforced Polymer (FRP) or Aluminium Composite Panel (ACP) paneling for interiors, etc. Besides, a policy decision has been taken to proliferate Linke Hofmann Busch (LHB) coaches. LHB type coaches are based on new technology and are of superior design as compared to conventional Integral Coach Factory (ICF) type coaches.

In addition to the above, Humsafar trains having additional amenities in the coaches have recently been introduced for providing comfortable Air-Conditioned III Tier travel.  Humsafar coaches have better passenger amenities, improved aesthetics, passenger announcement system, Closed-Circuit Television (CCTV) based surveillance system, etc. Also, Antyodaya and Deen Dayalu coaches for unreserved travel, having additional amenities in the coaches, have been introduced in service.  These coaches have features such as cushioned luggage racks, drinking water dispenser, pleasing interior and exterior with anti-graffiti measures, enhanced number of mobile charging points, etc.

Targets set for the manufacture of Humsafar/Deen Dayalu and Antyodaya coaches for the next three years, which are available now, are as under:

Type of coach 2017-18

(coaches)

2018-19

(coaches)

2019-20

(coaches)

Humsafar 200 200 200
Deen Dayalu 385 384 392
Antyodaya 160 200

The modernization/upgradation of rail coaches of Mainline trains as a continual process is carried out based on availability of capacities/funds.

 The zone-wise holding of coaches of Indian Railways, as on 31.03.2016 is as below:

Zonal Railway Number of coaches
Central Railway 5241
Eastern Railway 4241
East Central Railway 3761
East Coast Railway 2572
Northern Railway 6659
North Central Railway 1473
North Eastern Railway 2702
Northeast Frontier Railway 2813
North Western Railway 2624
Southern Railway 6784
South Central Railway 4686
South Eastern Railway 3389
South East Central Railway 1146
South Western Railway 3439
Western Railway 4639
West Central Railway 1415
Total 57584

Indian Railways undertakes Mid-Life Rehabilitation (MLR) of Mainline coaches in a programmed manner depending upon the capacity and availability of funds. During 2016-17 (upto February 2017), ­­­­­­­­­766 such coaches underwent MLR. It is planned to do MLR for around 1000 coaches in 2017-18.

As a part of MLR, selected number of coaches are being refurbished. Refurbished coaches with improved interiors, vibrant colour scheme, additional amenities, etc. have been inducted in the Mahamana Express running between New Delhi and Varanasi. Additional coaches are taken up for refurbishing based on sanctions under the Rolling Stock Programme and availability of capacities/funds.

Previous articleBio-Toilets In Trains and at Railway Stations
Next articleHappy spouse, happy house
Saurabh
IndianBureaucracy.com (the “Site”) is a Registered Trademark & Premium SSL secured web site owned by CentruMedia also known as CentruMedia Network Pvt Ltd, a Gurugram, India, registered company. By using the Site, you expressly acknowledge and agree that any use of the Site will be in accordance with these Terms of Use. If you do not agree to be bound by these Terms of Use, you may not use the Site. CentruMedia may change, add or remove portions of this Agreement at any time. Each time you use the Site, the current version of this Agreement will apply.